Centrifugal Fan for Hot Water/Steam Boiler of Coal/Poor Coal/Wood Pellet/Coco Nut/Biomass/Bagasse Fired
Centrifugal Fan for Hot Water/Steam Boiler of Coal/Poor Coal/Wood Pellet/Coco Nut/Biomass/Bagasse Fired

Centrifugal Fan for Hot Water/Steam Boiler of Coal/Poor Coal/Wood Pellet/Coco Nut/Biomass/Bagasse Fired

Package size per unit product 80.00cm * 120.00cm * 120.00cm Gross weight per unit product 700.000kg BOILER /OIL HEATER I

Send your inquiry

DESCRIPTION

Basic Info
Material Iron
Usage for Manufacture
Flow Direction Centrifugal
Pressure High Pressure
Certification ISO, CE, CCC
Transport Package Naked
Trademark QD Hammer
Origin Qingdao
HS Code 84029000
Production Capacity 100PCS/Month
Packaging & Delivery
Package size per unit product 80.00cm * 120.00cm * 120.00cm Gross weight per unit product 700.000kg
Product Description

Centrifugal Fan for Hot Water/Steam Boiler of Coal/Poor Coal/Wood Pellet/Coco Nut/Biomass/Bagasse Fired


BOILER /OIL HEATER INDUCED FAN DATA
ID MODELGY1-15 R45°GY2-15 R45°GY4-15 R0°GY6-15 R0°GY8-15 R0°GY10-15 R0°GY15-15 R0°GY20-15 R0°Y5-47NO.14D R0°
ID PRESSURE2942-2373Pa3668-3020Pa3800-3510Pa4106-4057Pa4024-3864Pa3714-3802Pa2450-1960Pa3695-2811Pa2540Pa
ID FLOWRATE3800-6800m3/h5200-8500m3/h11500-16000m3/h15756-19320m3/h19542-22835m3/h26321-32138m3/h37754-46453m3/h62888-92540m3/h98420m3/h
ID MOTOR7.5kw11kw22kw37kw45kw55kw75kw110kw200kw
SUITABLE FOR BOILER 1T/H2T/H4T/H6T/H8T/H10T/H15T/H20T/H35T/H
SUITABLE FOR OIL HEATER0.6MKCAL/H1.2MKCAL/H2.4MKCAL/H4MKCAL/H5MKCAL/H6MKCAL/H9MKCAL/H12MKCAL/H21MKCAL/H

 

Centrifugal Fan for Hot Water/Steam Boiler of Coal/Poor Coal/Wood Pellet/Coco Nut/Biomass/Bagasse Fired


BOILER /OIL HEATER FORCED FAN DATA
FD MODELGG1-15 R0°GG2-15 R225°GG4-15 R225°GG6-15 R225°GG8-15 R90°GG10-15 R180°GG15-15 R225°GG20-15 R225°G4-73NO.11D R90°
FD PRESSURE1834-1579Pa2550-3138Pa3314-2844Pa3099-2824Pa3099-2824Pa2999-2734Pa3704-3812Pa3138-2304Pa2540Pa
FD FLOWRATE2400-3500m3/h2600-4200m3/h3600-6000m3/h5800-9000m3/h10000-15000m3/h14645-20795m3/h23812-25435m3/h35000-62000m3/h605703m3/h
FD MOTOR4kw5.5kw11kw11kw15kw22kw37kw55kw90kw
SUITABLE FOR BOILER 1T/H2T/H4T/H6T/H8T/H10T/H15T/H20T/H35T/H
SUITABLE FOR OIL HEATER0.6MKCAL/H1.2MKCAL/H2.4MKCAL/H4MKCAL/H5MKCAL/H6MKCAL/H9MKCAL/H12MKCAL/H21MKCAL/H

FAQ
Q1: Where is your company?A1: We are located in qingdao which is famous for international business and international sea port, it's east to delivery boiler to Southeast Asia, Africa, Middle East, South America, Oceania and Europe.Q2: What is the Warranty for the boilers?A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. Q3: How about the installation and commissioning?A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers. Q4: What's the production lead time for delivery?A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc. Q5: What about your payment term?A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.Q6: What kind of documents will be provided?A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request. Q7: What's your MOQ?A7: Only 1 set, if you have more than that, you will get a more favorable price. Q8: How's the packaging & shippingA8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For solid fuel boilers, bigger than 2 ton/hr or 1.4 MW shall be shipped by frame rack (flat) container or bulk carrier.